Open Groove Hook on System

         
   

Gasket Hook on System

 
 
Actual Time & Motion Study report ABTI Substructure Systems V/s. Standard Mechanical System for 10.18 m2
* ABTI Ventilated Substructure systems has a 15% faster production rate
Actual Time & Motion Study report ABTI Substructure Systems V/s. Standard Mechanical System for 10.18 m2
* ABTI frame work installation is 5% faster
 
       
* Setting up ABTI Panelling is 400 times faster
       
   